<?xml version='1.0' encoding='UTF-8'?><rss xmlns:atom='http://www.w3.org/2005/Atom' xmlns:openSearch='http://a9.com/-/spec/opensearchrss/1.0/' version='2.0'><channel><atom:id>http://www.blogger.com/feeds/14835253/posts/full</atom:id><lastBuildDate>Thu, 29 Sep 2005 21:20:57 +0000</lastBuildDate><title>900 News</title><description></description><link>http://biomol.uchsc.edu/rm900/900-news.html</link><managingEditor>Geoff</managingEditor><openSearch:itemsPerPage>15</openSearch:itemsPerPage><item><guid isPermaLink='false'>http://www.blogger.com/feeds/14835253/posts/full/115152464055539873</guid><pubDate>Wed, 28 Jun 2006 19:37:00 +0000</pubDate><atom:updated>2006-06-28T12:57:23.148-07:00</atom:updated><title>Test Library Now Available!</title><description>&lt;div xmlns="http://www.w3.org/1999/xhtml">Now that the testing phase of the spectrometer is complete we would like to make our findings available to our users and to the NMR community.  It has taken a lot of effort to bring the system up to the high level of performance that it is at now and we feel that there is no point in keeping the fruits of this labor under wraps.  In posting this information we have made efforts to ensure that each data set is representative of the &lt;it>average&lt;/it> performance of the system, and that the results are reproducible.  It is our hope that these parameter sets will be useful not only to our users, but to anyone who is evaluating a new or existing system.  In order to keep track of the demand for this information we ask that users register prior to accessing the library.&lt;br>&lt;br>&lt;br />Check it out at &lt;a href="http://biomol.uchsc.edu/rm900/testlib.html">http://biomol.uchsc.edu/rm900/testlib.html&lt;/a>&lt;/div></description><link>http://biomol.uchsc.edu/rm900/2006/06/test-library-now-available.html</link><author>Geoff</author></item><item><guid isPermaLink='false'>http://www.blogger.com/feeds/14835253/posts/full/114902112170614079</guid><pubDate>Tue, 30 May 2006 20:31:00 +0000</pubDate><atom:updated>2006-05-30T13:51:18.480-07:00</atom:updated><title>Open for Business</title><description>&lt;div xmlns="http://www.w3.org/1999/xhtml">We are pleased to announce the opening of the Rocky Mountain Regional 900 MHz facility to users!  &lt;a href=http://biomol.uchsc.edu/rm900/proposal.html>Proposals&lt;/a> may still be submitted if you would like to request time on the system.  We are requiring that users visit the facility to set up their first experiments, and we will set up access for future experiments to be conducted remotely if so desired.  For the first few months of operation we are prepared to offer the spectrometer time for this initial visit free of charge.  We are looking forward to meeting all of you and hearing about any specific needs you may have.  Your comments will help to make our facility better for everyone.&lt;/div></description><link>http://biomol.uchsc.edu/rm900/2006/05/open-for-business.html</link><author>Geoff</author></item><item><guid isPermaLink='false'>http://www.blogger.com/feeds/14835253/posts/full/114547127493990737</guid><pubDate>Wed, 19 Apr 2006 18:23:00 +0000</pubDate><atom:updated>2006-04-19T11:27:54.956-07:00</atom:updated><title>ENC Meeting</title><description>&lt;div xmlns="http://www.w3.org/1999/xhtml">I will be attending the ENC meeting at Asilomar next week.  If anyone would like to meet to discuss anything about the facility, or just to get to know me and put a face with a name, I'll be available throughout the conference.  Send me an email, or give me a call and we can work out a meeting place and time.  I'll be posting a note at the message board with my email and cell number when I arrive.  Hope to meet some of you there!&lt;/div></description><link>http://biomol.uchsc.edu/rm900/2006/04/enc-meeting.html</link><author>Geoff</author></item><item><guid isPermaLink='false'>http://www.blogger.com/feeds/14835253/posts/full/114347795856839769</guid><pubDate>Mon, 27 Mar 2006 16:45:00 +0000</pubDate><atom:updated>2006-03-27T08:45:58.596-08:00</atom:updated><title>Almost there!</title><description>&lt;div xmlns="http://www.w3.org/1999/xhtml">We are just a few weeks away from being open for business.  Most of our testing has concluded and Varian is finishing up with the last of their remaining issues.  So now is the time to finish up your proposals and get them to us for approval.  If you require some notice to prepare samples and/or travel arrangements, make a note on your application and we will contact you for scheduling.  Otherwise we will start scheduling users from day 1.&lt;br />&lt;br />There have also been some inquiries during our testing phase that I would like to share with everyone:&lt;br />&lt;br />Q:  What sequences do you have available for immediate use?&lt;br />&lt;br />A:  We have the BioPack suite of sequences installed and tested.  We have optimized parameter sets for these experiments available as a starting point for initial work on the 900.  We also have tested sequences from Lewis Kay's library, but many of these have been optimized for large deuterated molecules and do not work as well with our ubiquitin test sample.  These sequences will be available for users by request.  All other "in-house" sequences must be pre-screened before being used on the 900.&lt;br />&lt;br />Q:  What is your policy on remote operation?&lt;br />&lt;br />A:  Currently we are not allowing remote operation.  Initially we would like all users to visit the facility and go through our orientation program before using the spectrometer.  After this initial visit we will consider remote operation applications.&lt;br />&lt;br />Q:  When will the cold probe become available?&lt;br />&lt;br />A:  We have a salt-tolerant cold probe on order from Varian.  The current delivery target for the probe is in May.  We hope to have the probe installed and tested by the end of the summer, but it is too far in advance to make any specific estimates.&lt;br />&lt;br />Q:  What is the cost for spectrometer time?&lt;br />&lt;br />A:  We are still covered by the NIH grant for the system, so initial costs will reflect our facility expenses only.  We have not yet worked out an exact number, but we expect to charge a similar fee as the current cost for the 800 facility in Boulder (approximately $4 an hour).&lt;br />&lt;br />Q:  How much spectrometer time can I request?&lt;br />&lt;br />A:  We are anticipating offering substantial blocks of time to our users so that multiple or long experiments can be run.  The actual amount of time will depend on demand, but it is possible that time requests up to 2 weeks long may be accommodated.&lt;br />&lt;br />I hope this addresses some of your questions, if you have any other inquiries please do not hesitate to ask me and I will do my best to address them.  We are looking forward to hearing from you.&lt;/div></description><link>http://biomol.uchsc.edu/rm900/2006/03/almost-there.html</link><author>Geoff</author></item><item><guid isPermaLink='false'>http://www.blogger.com/feeds/14835253/posts/full/113658691561192053</guid><pubDate>Fri, 06 Jan 2006 22:22:00 +0000</pubDate><atom:updated>2006-01-06T14:35:15.626-08:00</atom:updated><title>Accepting Proposals</title><description>&lt;div xmlns="http://www.w3.org/1999/xhtml">Testing of the spectrometer is proceeding smoothly and we anticipate being able to open the facility up to users in the coming months.  As the facility was funded through a consortium grant, we have established a committee of users that will be in charge of approving projects for the system.  All interested users are encouraged to submit an &lt;a href="http://biomol.uchsc.edu/rm900/proposal.html">application&lt;/a> outlining the proposed project.  These proposals will be reviewed by the committee and time will be awarded based on merit and applicability for 900 MHz.  Users from within the consortium will be given priority, but proposals from other publicly funded institutions will also be considered.&lt;br />&lt;br />We request that potential users be available to travel to the facility to collect data, as we will be providing on-site training.  Once users have visited the facility and undergone the training program we will consider requests for remote operation of the spectrometer.&lt;br />&lt;br />We are looking forward to seeing the exciting new projects that you will bring to the facility!&lt;/div></description><link>http://biomol.uchsc.edu/rm900/2006/01/accepting-proposals.html</link><author>Geoff</author></item><item><guid isPermaLink='false'>http://www.blogger.com/feeds/14835253/posts/full/113156803699938003</guid><pubDate>Wed, 09 Nov 2005 20:23:01 +0000</pubDate><atom:updated>2005-11-09T12:27:17.023-08:00</atom:updated><title>Probe comparisons</title><description>&lt;div xmlns="http://www.w3.org/1999/xhtml">Just a quick update.  We've been collecting a lot of data over the past couple of weeks, checking for anything that might be out of place.  Varian has sent another probe out to us with an engineer to run some comparisons of the performance of each probe.  There are some improvements that we want to see before we move ahead with testing.  This will probably slow us down a little, but is to be expected in the installation of such a high-end piece of equipment.&lt;/div></description><link>http://biomol.uchsc.edu/rm900/2005/11/probe-comparisons.html</link><author>Geoff</author></item><item><guid isPermaLink='false'>http://www.blogger.com/feeds/14835253/posts/full/113043512182926911</guid><pubDate>Thu, 27 Oct 2005 17:35:00 +0000</pubDate><atom:updated>2005-10-27T10:45:21.853-07:00</atom:updated><title>Facility Testing</title><description>&lt;div xmlns="http://www.w3.org/1999/xhtml">Facility testing has been going on this week as we establish a baseline for the performance of the system in years to come.  Our overnight tests of the drift rate are now coming out at less than 3 proton Hz per hour!  All of the multi-dimensional protein data that we collected on Ubiquitin is looking great and we can't wait to see some results from a more challenging sample.  We have also been able to improve remote access through the campus network so that it will be easier for users to log-in and get their data from afar.  The coming months should prove to be very exciting!&lt;/div></description><link>http://biomol.uchsc.edu/rm900/2005/10/facility-testing.html</link><author>Geoff</author></item><item><guid isPermaLink='false'>http://www.blogger.com/feeds/14835253/posts/full/112990966229189544</guid><pubDate>Fri, 21 Oct 2005 15:30:00 +0000</pubDate><atom:updated>2005-10-21T08:47:42.303-07:00</atom:updated><title>Next Phase</title><description>&lt;div xmlns="http://www.w3.org/1999/xhtml">Well this week we have been finishing all of the tests with Varian.  Monday the spectrometer will be handed over to us to begin our facility tests.  We have established a stringent series of experiments that will give us a clear idea of how the spectrometer is functioning so that if there ever are any problems down the line we can easily run the comparisons.  We still have a few issues that have not yet been settled with Varian so negotiations are ongoing, but we can continue progress while that goes on.  As we get closer to opening up to users we are looking out for ways to make the facility even better.  As always we welcome questions and comments!&lt;/div></description><link>http://biomol.uchsc.edu/rm900/2005/10/next-phase.html</link><author>Geoff</author></item><item><guid isPermaLink='false'>http://www.blogger.com/feeds/14835253/posts/full/112905198944231781</guid><pubDate>Tue, 11 Oct 2005 17:25:00 +0000</pubDate><atom:updated>2005-10-11T10:33:09.453-07:00</atom:updated><title>Return of the probe</title><description>&lt;div xmlns="http://www.w3.org/1999/xhtml">The probe is back now and we will be testing it thoroughly over the next few days.  They could find nothing wrong with it back in Palo Alto, so we'll see if anything has been fixed at all.  We've used the lull to complete a few updates to the facility, in particular installing the UPS to power the console.  In a test we performed last week with the console idle the UPS supported the power usage for 3 hours without line power.  This is well in excess of what should be required for the system, as all of the power is backed up by the campus emergency generator.  We had an actual test of the power back-ups this weekend as we had a brief power outage Sunday morning.  Apart from calling me in to check on things the system weathered the outage without any problem.&lt;/div></description><link>http://biomol.uchsc.edu/rm900/2005/10/return-of-probe.html</link><author>Geoff</author></item><item><guid isPermaLink='false'>http://www.blogger.com/feeds/14835253/posts/full/112854243769505756</guid><pubDate>Wed, 05 Oct 2005 19:57:00 +0000</pubDate><atom:updated>2005-10-05T13:00:37.703-07:00</atom:updated><title>Some bad news</title><description>&lt;div xmlns="http://www.w3.org/1999/xhtml">During one of the installations tests we encountered a slight problem with the probe.  We are sending it back to be checked-up and should only be down for a couple of days.  We'd rather have this happen now than further down the line.  Other than that the tests are still progressing well, we've only uncovered a few minor concerns so far.&lt;/div></description><link>http://biomol.uchsc.edu/rm900/2005/10/some-bad-news.html</link><author>Geoff</author></item><item><guid isPermaLink='false'>http://www.blogger.com/feeds/14835253/posts/full/112785482256380985</guid><pubDate>Tue, 27 Sep 2005 20:54:00 +0000</pubDate><atom:updated>2005-09-27T14:00:22.573-07:00</atom:updated><title>3D Data!</title><description>&lt;div xmlns="http://www.w3.org/1999/xhtml">&lt;a href="http://biomol.uchsc.edu/rm900/uploaded_images/Strip_Ubiquitin-746605.tiff">&lt;img style="float:center; margin:0 10px 10px 0;cursor:pointer; cursor:hand;" src="http://biomol.uchsc.edu/rm900/uploaded_images/Strip_Ubiquitin-737929.tiff" border="0" alt="" />&lt;/a>&lt;br />Here's a small section of a 3D CBCA(CO)NH strip plot of Ubiquitin.  This spectrum was acquired in 16 hours as part of the testing and installation of the Varian NMR system.&lt;/div></description><link>http://biomol.uchsc.edu/rm900/2005/09/3d-data.html</link><author>Geoff</author></item><item><guid isPermaLink='false'>http://www.blogger.com/feeds/14835253/posts/full/112724310666313830</guid><pubDate>Tue, 20 Sep 2005 18:57:00 +0000</pubDate><atom:updated>2005-09-20T12:05:06.663-07:00</atom:updated><title>Lineshape stability</title><description>&lt;div xmlns="http://www.w3.org/1999/xhtml">We've accumulated some drift data over the past few weeks and all is looking very good.  The magnet drift is down at 4.5 Hz per hour, and the lineshape drift meets spec easily over a 12 hour period.  This spec was due to be met 6 months after magnet energization so we are very happy to see it come in early.&lt;/div></description><link>http://biomol.uchsc.edu/rm900/2005/09/lineshape-stability.html</link><author>Geoff</author></item><item><guid isPermaLink='false'>http://www.blogger.com/feeds/14835253/posts/full/112689892079719574</guid><pubDate>Fri, 16 Sep 2005 19:18:00 +0000</pubDate><atom:updated>2005-09-16T12:28:40.843-07:00</atom:updated><title>Weekly Update</title><description>&lt;div xmlns="http://www.w3.org/1999/xhtml">Well Varian has been working hard all week to achieve the sensitivity spec for the system, but so far has been unable to meet the sucrose test requirements.  They are doing a lot of troubleshooting though and seem to be progressing well.  We have been checking on some vibrations as well this week and are tweaking the facility to get us the best possible results.  This installation has been a good test of our remote operation capabilities, so the process of running the spectrometer from remote sites is almost completely ironed out.  We feel that this is incredibly important for our users, as not having to travel to Denver to operate the system will substantially decrease the cost of using this facility.&lt;/div></description><link>http://biomol.uchsc.edu/rm900/2005/09/weekly-update.html</link><author>Geoff</author></item><item><guid isPermaLink='false'>http://www.blogger.com/feeds/14835253/posts/full/112610844781344026</guid><pubDate>Wed, 07 Sep 2005 15:47:00 +0000</pubDate><atom:updated>2005-09-07T08:54:07.816-07:00</atom:updated><title>Solaris 10 and VNMRJ</title><description>&lt;div xmlns="http://www.w3.org/1999/xhtml">Remote testing has begun, although we ran into a snag yesterday with loading the shims for an experiment.  Apparently VNMRJ does not play well with Solaris 10.  So we will be downgrading the system today to Solaris 9 in the hopes that some of the inconveniences we've been experiencing will be alleviated.  Apart from that things are still progressing here on schedule.&lt;/div></description><link>http://biomol.uchsc.edu/rm900/2005/09/solaris-10-and-vnmrj.html</link><author>Geoff</author></item><item><guid isPermaLink='false'>http://www.blogger.com/feeds/14835253/posts/full/112535414368588710</guid><pubDate>Mon, 29 Aug 2005 22:15:00 +0000</pubDate><atom:updated>2005-08-30T11:28:08.053-07:00</atom:updated><title>On-site installation</title><description>&lt;div xmlns="http://www.w3.org/1999/xhtml">The on-site installation is almost complete.  The console is set up and all tests are going smoothly.  However, there are still many tests to be performed to gauge the quality of the system, these will be performed either remotely by Varian personnel, or by the facility manager.  Some of these tests are required after the magnet has stabilized for three months, so if everything passes, the final installation and acceptance may occur in November.  This is an approximate timeline, of course, but as we progress further, we will be able to be more specific.&lt;/div></description><link>http://biomol.uchsc.edu/rm900/2005/08/on-site-installation.html</link><author>Geoff</author></item></channel></rss>