Return of the probe
The probe is back now and we will be testing it thoroughly over the next few days. They could find nothing wrong with it back in Palo Alto, so we'll see if anything has been fixed at all. We've used the lull to complete a few updates to the facility, in particular installing the UPS to power the console. In a test we performed last week with the console idle the UPS supported the power usage for 3 hours without line power. This is well in excess of what should be required for the system, as all of the power is backed up by the campus emergency generator. We had an actual test of the power back-ups this weekend as we had a brief power outage Sunday morning. Apart from calling me in to check on things the system weathered the outage without any problem.