Update
Chris has arrived and has begun putting in the cryoshims. This magent appears to be rather well behaved as none of the cryoshims were very large in the factory. This bodes well for drift spec. Our eventual drift came out at about 4.5 proton Hz/hr after the 10 days of settling. This will of course change slightly as the shims settle in, but is a good starting point. Next week (the 15th) the Varian engineer will arrive to set up the console and map the field. Stay tuned!

0 Comments:
Post a Comment
<< Home